Skip to content

Fire Safety Drawing Assessment

Is your design heading for a fire-safety problem?

Drop in your plans. In about two minutes you get an indicative Approved Document B readiness score and the issues most likely to come back from Building Control.

Drop plans, sections and elevations here

PDF · up to 50 MB each · maximum 3 files

No account neededDrawings deleted after 7 daysClause-referenced findings
Indicative screening only. Not a fire strategy or a determination of compliance. Higher-risk buildings (18 m+ / 7+ storeys) are flagged for engineer review rather than scored.